Athena Ash Pond
Supekar Associates successfully executed the Athena Power Ash Pond construction project, delivering a robust containment system for safe ash disposal and environmental protection. The work included profile making, grading, chaining, slope rolling, and sub‑grade preparation with precision compaction to achieve the required design levels.
The project also involved HDPE liner installation, toe trench excavation, and GSB road formation, ensuring long‑term stability and efficient drainage. Supekar Associates applied advanced civil engineering practices and strict quality control to meet power‑sector standards.This project demonstrates our expertise in industrial earthwork and environmental infrastructure — combining technical excellence, sustainability, and reliability to support India’s growing energy network.
